Home > Blogs > Pintor1948 > > Blog Post

The dungeon

3:29 pm Thursday, 31st December, 2009

ALTHOUGH NOT AN EXTENSIVE DUNGEON clever use of areas had facilitated maximum use for ingenious equipment at great economy.
Long scaffold tubes which ran the length of the ceiling were fixed to r.s.j. beams. The beams were supported in turn by steel stanchions .
The arrangement formed a grid work to which virtually any bondage or lifting equipment could be fitted in any place of the dungeon.
Zelda had purchased a carbon fiber run of six stocks. Light in weight but firm for use.
She could treat six clients in one session.
At the far end was a shower and a drain which being below ground, pumped
compressed sewage away. An anal douche and a stainless bowel.t.b.c.



Blog Introduction

Get full access to all site features
Register Now